BACKGROUND OF PROJECT


Chris Ostwald and his partner Jo live in North London with their children Lewis and George. With a third child on the way, family life is already promising to be even more hectic. As if the kids aren’t enough to keep them busy, Chris runs three shops and a cafe. But before this, he worked on special effects for big budget movies and now finds life as a shopkeeper a little frustrating.
Chris & Jo From the Chilterns Grand Design
20 years ago Chris chose a beautiful spot in the Chiltern Hills in South Oxfordshire as the place to build the home of his dreams. He bought the wooded hillsideplot for its extraordinary views. But for two decades he has agonised over what he should build. Now he’s found inspiration in the most unlikely of places - he saw a replica of a watermill - in Glade Creek, West Virginia - on a yoghurt pot!
Now, working with a string of different architects, Chris has designed a full scale replica of the American watermill. But building it for real on a steep hillside will be something of a challenge.

The Plan

Chris’s solution is to first construct a level platform cut into the chalk hill, on steel legs. This steel frame will serve as a table on which the house can sit, as well as an under-house storage area. There’ll also be space for an entrance hall, cloakroom andstaircase leading up into the house.
On top of this he’ll build the mill’s frame and skin, shipped over in authentic kit form from New Hampshire. Within this there’ll be a master bedroom with en suitebathroom on the ground floor, and a striking double height main living room with anopen plan kitchen. This living room will be lit by rows of double doors at the back and full-height windows looking out on the views at the front. Upstairs there’ll be two further bedrooms, sharing a family bathroom but each with their own balconies.
Plans From the Chiltern Grand Design
A wooden bridge will link the house to the forest behind, while at the front a mill owner’s timber deck will take advantage of those views… And finally, the item no self-respecting mill could be seen without: a waterwheel.

Budget & Timeframe

His budget is £120,000 and he hopes to have it built in just over a year. The house is being built using a pre-cut timber frame from America. Although it's a kit home, the frame is usually assembled by a team of six skilled carpenters. Slightly worryingly, instead of tradesmen Chris has roped in an eclectic bunch of old work buddies and family friends.
Timber Frame From the Chilterns Grand Design

A Complete Disaster?

Disaster strikes - a neighbour complains to the council that the build differs in height to the dimensions given on theplanning application. Even though Chris is convinced he’s built to the plans he originally submitted, the planning department aren't so sure.
Sadly for Chris, inspectors decide that his half-built house doesn't match the criteria he set on his consent - and that means he doesn't have planning permission for what he's built. Following much wrangling and a wait of 18 months after the original meeting, Chris’s house finally gets planning permission granted. But as ever, circumstances seem to work against Chris. With the UK economy slumping he has to return to London to take care of his retail businesses, leaving his Oxfordshire mill to sit empty.
In the eight months since getting the all-clear, Chris barely touches the house. On the bright side, he does attack building the focal wooden bridge with renewed vigour, and some help from son Lewis.
The house may not be finished, but its character and charm are there for all to see.

AIMS AND OBJECTIVES

AIM
To Build a Water Mill at Chiltern Hills in South Oxfordshire  based on the American Water Mill in Glade Creek, West Virginia. The Project has to be completed in 1 year within a budget of £1,20,000.


OBJECTIVES

  • To level the plot 
  • To construct a Model
  • Steel Framework
  • Timber Covering
  • Roofing
  • Bridge
  • Insulating and Gluttering
  • Painting and Interior Design
CHALLENGES
  • Sloppy Plot
  • Legal Documentation
  • Hiring Workers
  • Design and Plan
  • Procurement
  • Constructing Frame
  • Finishing Touches

STRUCTURE AND MODEL

CONSTRUCTION STAGES

COMMENTS

In the proposed project the role of the project manager is done by the owner

Estimated Budget(CHRIS): £120,000
Estimated Budget in proposed project : £167,393.90

Estimated Time(CHRIS): 1 year
Estimated Time in proposed project : 276 days

On half way mark of Chris' project inspectors decide that his half-built house doesn't match the criteria he set on his consent - and that means he doesn't have planning permission for what he's built. Following much wrangling and a wait of 18 months after the original meeting, Chris’s house finally gets planning permission granted. But as ever, circumstances seem to work against Chris. With the UK economy slumping he has to return to London to take care of his retail businesses, leaving his Oxfordshire mill to sit empty. Chris couldn't complete the work in the estimated time and his budget also exceeded towards the end.











OTHER SUPPLIERS

Architect
Brian Johnson
Tel: 020 7288 0398

Structural Engineers
Ingealtoir
Tel: 020 8883 3313

Concrete Retaining Wall
Richard Simmons
Fortictete Ltd
Tel: 01298 23333
Fax: 01298 23000
engsales@forticrete.com
www.forticrete.co.uk

Concrete Reinforcement
Lemon Groundworks
Tel: 01268 571571
Fax: 01268 571555

Engineered Floor Joists
CR Timber Ltd
Tel: 01787 223003 or 223888
Fax: 01787 224495
info@crtimber.co.uk
www.crtimber.co.uk

Waterproof Membrane
Delta Membrane Systems Ltd
Tel: 01992 523811
Fax: 01992 524046
info@deltamembranes.com
www.deltamembranes.com

Waterproof Floor Deck 
Puhos Board UK Ltd
Tel: 01582 461 717/818
Fax: 01582 765 141/142
sales@puhos.co.uk
www.puhosboard.com

Breathable Membrane (Roof Felt Underlay)
Dupoint (Tyvek)
T: 01275 879770
www.tyvekhome.com

Wiring System
Modular Wiring Systems
Tel: 01753 566 700
Fax: 01753 655 701
info@modwire.com
www.modularwiring.com

Plant & Equipment Hire
Helpful Hirings
Tel: 01844 212468
Fax: 01844 261488
www.helpfulhirings.co.uk

Hand Tools
DeWalt
www.dewalt.co.uk

Nail Guns
Paslode Division
ITW Ltd.
Tel 0800 833 381
Fax: 0800 521 077
www.paslode.co.uk

Scaffolding
G S Scaffolding Ltd
Tel: 01993 840805

Plants and Trees
Europlants (U.K) Ltd
Tel. 01707 649996

Buckingham Nurseries
Tel: 01280 813556
www.hedging.co.uk

Builders Merchants
Jewson (High Wycombe)
Tel: 01494 465448
www.jewson.co.uk

Build Center
Tel: 01494 521100
www.build-center.co.uk

Mobile Home
Sambeck Caravans Limited
Tel: 01206 255 223
Fax: 01206 257 391
info@sambeckcaravans.co.uk
www.sambeckcaravans.co.uk

Planning Consultant
Nik Lyzba DipTP DipCP MRTPI
JPPC Chartered Town Planners
Tel: 01865 326823
planning@jppc.co.uk

Planning Solicitor
Deborah Ceadel
Darbys Solicitors LLP
Tel: 01865 811700
Fax: 01865 811777
dceadel@darbys.co.uk
www.darbys.co.uk